The Loft |
Design & Technology
  Unique features:
 
The Loft | Adjustable Outhaul | installation - step 3


Outhaul threading

Lead the line back to the boom end, then thread the line through the clew and then back to the boom end and cleat. For additional outhaul power (if your boom end is so adapted) the line can be tied off at the sail clew.

« back | next »

 

 
credits archives 2003 | 2004 | 2005 | 2006
copyright © 2007 The Loft info@loftsails.com
CMS web kameleon , powered by E-surf
back to top